Repairs (Pressure Vessel Repair)Buy your NBIC Today!

Anytime welding is completed on a ASME pressure vessel, a NBIC repair form [R1 or R2] for repair work isneeded.

Always comply with your State or Providence requirements, but use the more stringent requirements.Welding can be any work from seal welding, to flush patches, to crack repairs, ...and welding attachments.

Do not allow welding unless the repair firm is an National Board of Boilers and Pressure Vessel Insepctors R-Stamp holder. A R-Stamp hold will issue a signed R-1 or R-2 form with a third partysignature signifiying that repairs were compliant to the ASME Boiler and Pressure Vessel Code Section-VIII (Section-8) and the NBIC (National Board Inspection Code.Buy your ASME Section V Div 1 Pressure Vessel Construciton Code

Repairs require the involvement of an commissioned inspector.

 

 